null

Little hazelnuts

MATERIAL

YARN Laines du Nord Poema Mohair 1 balls 50 gr. (420 m), RE1 stitch-marker, Needles n.4,5.

SAMPLE

cm 10x10 = stitches 20, rows30

SHARE
ABBREVIATIONS

K=knit. P=purl. YO=yarn over. K2tog= knit 2 sts together RS=right side.WS= wrong side; SKP= slip 1, K1, pass slipped stitch over; SM=stitch marker; sSM= slip Stitch Marker.

NOTES

This shawl is worked back and forth. The lace is very simple is on a stochinette stitch basis.

MEASURES

Measures after blocking: width 220 cm; height: 45 cm.

POINTS USED

GARTER ST.
BOBBLE In the indicated stitch CAST on 2 stitchs, K 3, bring back to the left needle,K 3, bring back to the left needle, K 3 , bring back to the left needle, K3tog.

INSTRUCTIONS

Setup with Long tail cast on 23 sts , and 2 row all to K.

RS 1° Row = insert CHART, place SM, K 1, YO, K 1

WS 2° Row = K1, in the same work: K 1, P1, all to K, sSM, all to P

RS 3° Row = follow theCHART, , sSM, all to K endYO, K 1

WS 4° Row = K1, in the same work: K 1, P1, K to SM, sSM, all to P

RS 5° Row = like row 3

WS 6° Row= All WS rows, like row 2

Repeat rows 3, 4 to end of chart one (until row 19 (RS) – 20 (WS) wich is not present into chart. Remove SM

THE CHART can be read from RIGHT to LEFT, from bottom to top.

REPEAT THE WORK LIKE THIS

RS 21° Row = insert CHART, place SM, all to K, and YO, K 1

WS 22° Row = K1, in the same work: K 1, P1, all to K, sSM, all to P

RS 23° Row = follow theCHART, , sSM, all to K endYO, K 1

WS 24° Row = like row 22

RS 25° Row = like row 23

WS 26° Row =All WS rows, like row 22

Repeat rows 23, 24 to end of chart (remove SM at row 30)

Work again continuosly from row 21 to 30 (remove M at row 30) almost to end of wool having enough yarn left to picots bind off.

Picot Cast off.

In the first st. *cast on 2 sts ,loosely cast off 7 sts, replace the stitch back on your left needle * repeat from * to * until all STITCHES have been casted off.

Blocking= Hand wash, squeeze a little, dry flat,pin the piece into shape.

null

Little hazelnuts

MATERIAL

YARN Laines du Nord Poema Mohair 1 balls 50 gr. (420 m), RE1 stitch-marker, Needles n.4,5.

SAMPLE

cm 10x10 = stitches 20, rows30

SHARE
ABBREVIATIONS

K=knit. P=purl. YO=yarn over. K2tog= knit 2 sts together RS=right side.WS= wrong side; SKP= slip 1, K1, pass slipped stitch over; SM=stitch marker; sSM= slip Stitch Marker.

NOTES

This shawl is worked back and forth. The lace is very simple is on a stochinette stitch basis.

MEASURES

Measures after blocking: width 220 cm; height: 45 cm.

POINTS USED

GARTER ST.
BOBBLE In the indicated stitch CAST on 2 stitchs, K 3, bring back to the left needle,K 3, bring back to the left needle, K 3 , bring back to the left needle, K3tog.

INSTRUCTIONS

Setup with Long tail cast on 23 sts , and 2 row all to K.

RS 1° Row = insert CHART, place SM, K 1, YO, K 1

WS 2° Row = K1, in the same work: K 1, P1, all to K, sSM, all to P

RS 3° Row = follow theCHART, , sSM, all to K endYO, K 1

WS 4° Row = K1, in the same work: K 1, P1, K to SM, sSM, all to P

RS 5° Row = like row 3

WS 6° Row= All WS rows, like row 2

Repeat rows 3, 4 to end of chart one (until row 19 (RS) – 20 (WS) wich is not present into chart. Remove SM

THE CHART can be read from RIGHT to LEFT, from bottom to top.

REPEAT THE WORK LIKE THIS

RS 21° Row = insert CHART, place SM, all to K, and YO, K 1

WS 22° Row = K1, in the same work: K 1, P1, all to K, sSM, all to P

RS 23° Row = follow theCHART, , sSM, all to K endYO, K 1

WS 24° Row = like row 22

RS 25° Row = like row 23

WS 26° Row =All WS rows, like row 22

Repeat rows 23, 24 to end of chart (remove SM at row 30)

Work again continuosly from row 21 to 30 (remove M at row 30) almost to end of wool having enough yarn left to picots bind off.

Picot Cast off.

In the first st. *cast on 2 sts ,loosely cast off 7 sts, replace the stitch back on your left needle * repeat from * to * until all STITCHES have been casted off.

Blocking= Hand wash, squeeze a little, dry flat,pin the piece into shape.

Menu


Non perderti gli aggiornamenti
sui nostri nuovi filati e i patterns gratuiti.

 
close-link