null

ARAN SCHOOL JACKET

MATERIAL

YARN = “Aran Tweed” by “Laines du Nord“50/90 m Color cod 2: 9 (10, 11) balls
NEEDLES = 5 mm
OTHER = stitch markers, tapestry needle, 7 buttons.

SAMPLE

18 stitches and 25 rows = 10 X10 cm in stocking st. with needles 5 mm. Adjust the needles size if it’s needed to achieve the correct gauge.

SHARE
ABBREVIATIONS

RS = right side;
WS = wrong side;
K = knit;
P = purl;
st(s) = stitch(es);
SM = stitch marker;
SMc = stitch marker that mark the chart;
sSM = slip SM;
K2tog = knit 2 sts together;
SKP = slip 1, K1, pass slipped st. over.
m1 = make one by picking up one a loop between two stitches and knitting into the back of the new stitch.
2/2 rc: (left cable) = Slip 2 stitches on cable needle, hold in back, K2, K2 from cable needle.
2/2 lc: (left cable) = Slip 2 stitches on cable needle, hold in front, K2, K2 from cable needle.
1/1 lc: (left cable) = Slip 1 stitches on cable needle, hold in front, K1, K1 from cable needle.
rep **= repeat from * to *

NOTES

Read Charts for bottom up; on RS (odd numbers) read from right to left, on WS (even number) from left to right.

This project is worked back and forth from the top down with raglan sleeves. Use 2 different colors for the 2 types of stitch markers to avoid getting confused.

MEASURES

SIZES S (M, L)

MEASURES OF THE FINISHED GARMENT:

Size in photos M
Bust circumference 108 cm
Total length: 53 cm
Length from underarm to hem: 33 cm
Sleeve length: 47 cm
xUpper sleeve circumference: 32 cm

POINTS USED

2/2 rib st.: Row 1: * K2, P2* rep ** to the end. Row 2: work sts as they appear.

INSTRUCTIONS

With needles 5 mm cast on 88 (98, 108) sts. Work back and forth.

Work 2 rows in stocking st.

Place SM as follows:

Row 3 (RS): K14(16, 18) (front), place SM, K4, place SM, K4(6, 8) (sleeve), place SM, K4, place SM, K11(12, 13), place SMc, K14, place SMc, K 11 (12, 13), [back], place SM, K4, place SM, K4(6, 8) (sleeve), place SM, K4, place SM, K14 (16, 18) (front).

Row 4 (WS): P to SM, sSM, K1, P2, K1, sSM, P to SM, sSM, K1, P2, K1, sSM, P to SMc, K2, P4, K2, P4, K2, slip SMc, P to SM, pMP, K1, P2, K1, sSM, P to SM, sSM, K1, P2, K1, sSM, P to the end.

Start the increases for sleeves, back and fronts as follows:

Row 5 (RS): Kto SM, m1, sSM, CHART A, sSM, m1, K to SM, m1, sSM, CHART A, sSM, m1, K to SMc, CHART B, K to SM, m1, sSM, CHART A, sSM, m1, K to SM, m1, sSM, CHART A, sSM, m1, K to the end.

(8 sts increased)

Row 6 (WS): P to SM, sSM, CHART A, sSM, P to SM, sSM, CHART A , sSM, P to SMc, CHART B, P to SM, sSM, CHART A, sSM, P to SM, sSM, CHART A, sSM, P to the end.

Repeat Rows 5 and 6 another 22 (23, 24 ) times

[sts on needles: 272 (290, 308) ]

Now place the sts for each sleeve onto holder or scrap yarn as follows:

RS: K to SM, remove SM, K4, place the next 50 (54, 58) onto holder or scrap yarn (sleeve), cast on 4 (6, 8) sts for underarm, remove SM, K4, remove SM, K to SM, remove SM, K4, remove SM, place the next 50 (54, 58) onto holder or scrap yarn (sleeve), cast on 4 (6, 8) sts for underarm, remove SM, K4, remove SM, K to the end

WS: P to SMc, CHART B, P to the end.

Work the body of the cardigan

Body sts: 180 (194, 208)

Work 20 rows in stocking st. as follows:

RS rows: K to SMc, SCHEMA B, K to the end.

WS rows: P to SMc, SCHEMA B, P to the end.

Start working CHARTS at sides as follows:

RS rows: K4, CHART C (8 sts), K to SMc, CHART B, K to 12 sts before end, CHART D (8 sts), K4.

WS rows: P4, CHART D (8 sts), P to SMc, CHART B, P to 12 sts before end, CHART C (8 sts), P4.

Continue working this way for the next 28 cm.

Hem

Rows 1 - 16: work in 2/2 rib st. as follows:

RS: * K2, P2 * rep ** to the end

WS: work sts as they appear.

Cast off all sts.

SLEEVE (X2)

Work in rounds.

Slip the 50 (54, 58) held stitches from holder to 5 mm circular needles (using the short cable or DPNs if you prefer); pick up and knit 4 (6, 8) underarm sts.

Place SM in the center of the underarm sts and work in the round. 54 (60, 66) sts.

Round 1: K

Round 2: K2tog, K to the end. 53 (59, 65) sts.

Knit 4 rounds

Decrease round: K1, K2tog, K to 2 sts before end, SKP. 51 (57, 63) sts.

Knit 5 rounds

Decrease round: K1, K2tog, K to 2 sts before end, SKP. 49 (55, 61) sts.

Knit 16 rounds

Decrease round: K1, K2tog, K to 2 sts before end, SKP. 47 (53, 59) sts.

Work in stocking st (K all rounds) until sleeve measures about 30 from underarm.

Next round: K and decrease evenly 7 (9, 11) sts (K2tog).40 (44, 48) sts

Cuff

Rounds 1 - 14: work in 2/2 rib st: *K2, P2 * rep ** to the end

Cast off all sts.

Make the second sleeve.

CENTRAL EDGES

Left side

With 5 mm needles pick up and knit 100 (102, 104) sts along the left central edge.

Work 10 rows in 2/2 rib st as follows:

Row 1: *K2, P2 * rep ** to the end.

Row 2: work sts as they appear

Cast off all sts,

Right side

With 5 mm needles pick up and knit 100 (102, 104) sts along the right central edge.

Work 10 rows in 2/2 rib st and on Row 3 work 7 buttonholes evenly.

Cast off all sts,

NECK

With 5 mm needles pick up and knit 100 (110, 120) sts along the neck.

Work 18 rows in 2/2 rib st as follows:

Row 1: *K2, P2 * rep ** to the end.

Row 2: work sts as they appear

Cast off all sts,

Sew the buttons in correspondence of the buttonholes.

Weave in all ends, wash and block garment carefully.

null

ARAN SCHOOL JACKET

MATERIAL

YARN = “Aran Tweed” by “Laines du Nord“50/90 m Color cod 2: 9 (10, 11) balls
NEEDLES = 5 mm
OTHER = stitch markers, tapestry needle, 7 buttons.

SAMPLE

18 stitches and 25 rows = 10 X10 cm in stocking st. with needles 5 mm. Adjust the needles size if it’s needed to achieve the correct gauge.

SHARE
ABBREVIATIONS

RS = right side;
WS = wrong side;
K = knit;
P = purl;
st(s) = stitch(es);
SM = stitch marker;
SMc = stitch marker that mark the chart;
sSM = slip SM;
K2tog = knit 2 sts together;
SKP = slip 1, K1, pass slipped st. over.
m1 = make one by picking up one a loop between two stitches and knitting into the back of the new stitch.
2/2 rc: (left cable) = Slip 2 stitches on cable needle, hold in back, K2, K2 from cable needle.
2/2 lc: (left cable) = Slip 2 stitches on cable needle, hold in front, K2, K2 from cable needle.
1/1 lc: (left cable) = Slip 1 stitches on cable needle, hold in front, K1, K1 from cable needle.
rep **= repeat from * to *

NOTES

Read Charts for bottom up; on RS (odd numbers) read from right to left, on WS (even number) from left to right.

This project is worked back and forth from the top down with raglan sleeves. Use 2 different colors for the 2 types of stitch markers to avoid getting confused.

MEASURES

SIZES S (M, L)

MEASURES OF THE FINISHED GARMENT:

Size in photos M
Bust circumference 108 cm
Total length: 53 cm
Length from underarm to hem: 33 cm
Sleeve length: 47 cm
xUpper sleeve circumference: 32 cm

POINTS USED

2/2 rib st.: Row 1: * K2, P2* rep ** to the end. Row 2: work sts as they appear.

INSTRUCTIONS

With needles 5 mm cast on 88 (98, 108) sts. Work back and forth.

Work 2 rows in stocking st.

Place SM as follows:

Row 3 (RS): K14(16, 18) (front), place SM, K4, place SM, K4(6, 8) (sleeve), place SM, K4, place SM, K11(12, 13), place SMc, K14, place SMc, K 11 (12, 13), [back], place SM, K4, place SM, K4(6, 8) (sleeve), place SM, K4, place SM, K14 (16, 18) (front).

Row 4 (WS): P to SM, sSM, K1, P2, K1, sSM, P to SM, sSM, K1, P2, K1, sSM, P to SMc, K2, P4, K2, P4, K2, slip SMc, P to SM, pMP, K1, P2, K1, sSM, P to SM, sSM, K1, P2, K1, sSM, P to the end.

Start the increases for sleeves, back and fronts as follows:

Row 5 (RS): Kto SM, m1, sSM, CHART A, sSM, m1, K to SM, m1, sSM, CHART A, sSM, m1, K to SMc, CHART B, K to SM, m1, sSM, CHART A, sSM, m1, K to SM, m1, sSM, CHART A, sSM, m1, K to the end.

(8 sts increased)

Row 6 (WS): P to SM, sSM, CHART A, sSM, P to SM, sSM, CHART A , sSM, P to SMc, CHART B, P to SM, sSM, CHART A, sSM, P to SM, sSM, CHART A, sSM, P to the end.

Repeat Rows 5 and 6 another 22 (23, 24 ) times

[sts on needles: 272 (290, 308) ]

Now place the sts for each sleeve onto holder or scrap yarn as follows:

RS: K to SM, remove SM, K4, place the next 50 (54, 58) onto holder or scrap yarn (sleeve), cast on 4 (6, 8) sts for underarm, remove SM, K4, remove SM, K to SM, remove SM, K4, remove SM, place the next 50 (54, 58) onto holder or scrap yarn (sleeve), cast on 4 (6, 8) sts for underarm, remove SM, K4, remove SM, K to the end

WS: P to SMc, CHART B, P to the end.

Work the body of the cardigan

Body sts: 180 (194, 208)

Work 20 rows in stocking st. as follows:

RS rows: K to SMc, SCHEMA B, K to the end.

WS rows: P to SMc, SCHEMA B, P to the end.

Start working CHARTS at sides as follows:

RS rows: K4, CHART C (8 sts), K to SMc, CHART B, K to 12 sts before end, CHART D (8 sts), K4.

WS rows: P4, CHART D (8 sts), P to SMc, CHART B, P to 12 sts before end, CHART C (8 sts), P4.

Continue working this way for the next 28 cm.

Hem

Rows 1 - 16: work in 2/2 rib st. as follows:

RS: * K2, P2 * rep ** to the end

WS: work sts as they appear.

Cast off all sts.

SLEEVE (X2)

Work in rounds.

Slip the 50 (54, 58) held stitches from holder to 5 mm circular needles (using the short cable or DPNs if you prefer); pick up and knit 4 (6, 8) underarm sts.

Place SM in the center of the underarm sts and work in the round. 54 (60, 66) sts.

Round 1: K

Round 2: K2tog, K to the end. 53 (59, 65) sts.

Knit 4 rounds

Decrease round: K1, K2tog, K to 2 sts before end, SKP. 51 (57, 63) sts.

Knit 5 rounds

Decrease round: K1, K2tog, K to 2 sts before end, SKP. 49 (55, 61) sts.

Knit 16 rounds

Decrease round: K1, K2tog, K to 2 sts before end, SKP. 47 (53, 59) sts.

Work in stocking st (K all rounds) until sleeve measures about 30 from underarm.

Next round: K and decrease evenly 7 (9, 11) sts (K2tog).40 (44, 48) sts

Cuff

Rounds 1 - 14: work in 2/2 rib st: *K2, P2 * rep ** to the end

Cast off all sts.

Make the second sleeve.

CENTRAL EDGES

Left side

With 5 mm needles pick up and knit 100 (102, 104) sts along the left central edge.

Work 10 rows in 2/2 rib st as follows:

Row 1: *K2, P2 * rep ** to the end.

Row 2: work sts as they appear

Cast off all sts,

Right side

With 5 mm needles pick up and knit 100 (102, 104) sts along the right central edge.

Work 10 rows in 2/2 rib st and on Row 3 work 7 buttonholes evenly.

Cast off all sts,

NECK

With 5 mm needles pick up and knit 100 (110, 120) sts along the neck.

Work 18 rows in 2/2 rib st as follows:

Row 1: *K2, P2 * rep ** to the end.

Row 2: work sts as they appear

Cast off all sts,

Sew the buttons in correspondence of the buttonholes.

Weave in all ends, wash and block garment carefully.

Menu